玻璃钢电力管又称玻璃纤维增强塑料导管,玻璃钢电力管产品抗压力强、重量轻、内壁光滑,摩擦系数小,在穿用电缆时轻松,不损伤电缆。玻璃钢电力管,是电力电缆、通信电缆地下设施中,在受外界压力或碰撞时,起保护作用的电缆保护装置。它在我们的生活中起着至关重要的作用,那么玻璃钢电力管的功能特性有哪些呢,下面我们就来了解一下吧。
Glass fiber reinforced plastic power tube is also called the glass fiber reinforced plastic pipe, glass fiber reinforced plastic power tube products, light weight, strong pressure, wall smooth, small friction coefficient, easily when wearing cable, does not damage the cable. Fiberglass electric power pipe is a protective cable protection device under external pressure or collision. It plays a very important role in our lives, so what are the functional characteristics of the fiberglass power pipe? Let's take a look at that.
首先是玻璃钢电力管强度高用在行车道下直埋无需加混疑土保护层能加快电缆工程建设进度。
First of all, the high intensity of the fiberglass tube is high enough to be buried under the line of the line without the need to add a concrete layer to accelerate the construction of cable construction.
其次是玻璃钢电力管管材有柔性能抵御外界重压和基础沉降所引起的破坏。
The second is the damage caused by the flexible ability to withstand external pressure and the foundation settlement.
第三是玻璃钢电力管绝缘无电腐蚀适用于单芯电缆敷设;有耐腐蚀的优点可在高温盐咸地带使用。
The third is that the insulation of the fiberglass electric tube is suitable for the installation of single cable cable. The advantages of corrosion resistance can be used in high-temperature salt-salt zones.
第四是玻璃钢电力管阻燃耐热性能好可在130度高温长期使用而不变形,同时玻璃钢电力管内壁光滑不刮伤电缆接头处加橡胶密封适应热胀冷缩有可防止砂泥进入。
Fourth is glass fiber reinforced plastic power tube good flame retardant thermal performance can be 130 degrees high temperature deformation, use for a long time without at the same time, glass fiber reinforced plastic power tube wall smooth not scrape the cable and rubber seal joint used to heat bilges cold shrink can prevent the sand into the mud.
第五是玻璃钢电力管设计采用承插式的连接方式方便安装连接。最后是玻璃钢电力管质轻安装施工简捷方便一人即可抬动两人便可就地实施安装能大大缩短施工周期降低安装造价同时又避免道路开挖暴露时间长影响城市交通秩序问题。
The fifth is the design of fiberglass and steel tube to install the connection easily. Finally, the glass fiber reinforced plastic power tube light installation construction convenient a person can be carried two people can be installed on the implementation can greatly shorten the construction period to reduce cost and avoid long exposure time influence the urban traffic road excavation order problem.