玻璃钢电缆管的安装施工
FRP复合玻璃钢电缆保护管的装卸必须采用人工扛抬的方法,切忌随意从车上抛扔,以免损坏承插口。
The loading and unloading of FRP composite FRP cable protection tube must be carried out manually, and avoid any random throw from the car, so as not to damage the socket.
玻璃钢电缆保护套管的施工规范
Construction specification for protective sleeve of glass reinforced plastic cable
(1)保护管标准长度为4米/6米,采用橡胶圈承插式接口连接或管件粘合连接,原则上以直埋敷设为主
(1) the standard length of the protection tube is 4 meters / 6 meters, and the rubber ring socket connection or pipe fittings shall be bonded together, which shall be based on direct buried laying
(2)管材埋深一般应离地面1米及以下
(2) the buried depth of the tube shall be 1 meter below the ground and below
(3)管材的搬运
(3) pipe handling
玻璃钢电缆保护管装卸注意事项玻璃钢电缆保护管装卸注意事项
Precautions for the protection of the protection pipe of glass and steel cables
A.管件装车搬运时,要防止管材散捆掉落
A. When the fitting of the fitting is carried, the pipe shall be prevented from falling
B.卸管材时,禁止将管材从车上往下扔,防止管材的端头损伤。玻管材的保管
B. When unloading the pipe, it is forbidden to throw the tube from the car to prevent the end damage of the pipe. The storage of glass tubes
A.管材应放在凹凸少的较平坦的地方保管,否则有可能使管材被泥水污损
A. The pipe should be kept in A less concave and convex place, or it may cause the pipe material to be defiled by the mud
B.管材堆放采用进字型叠法或单根依固,防止管子散捆
B. The tube shall be stacked with a type of crossbar or single root to prevent the pipe from being loose